​
​
​
DISPLAYS OF DALTON
​
​
​
​
​
​
​
​
displaysofdalton@windstream.net
706-673-2990
ZEUS 20
STAND UP THE FRAME BY THE FEET.
**NOTE – DO NOT TIGHTEN DOWN BOLTS UNTIL STEP 6 **
BOLT EACH LOWER LEVELER LEG ON THE BACK SIDE OF THE FRAME USING THE ½" X 6 ½" BOLTS.
– MAKE SURE THE LEVELER IS FACING DOWN. -
BOLT THE UPPER LEGS TO THE LOWER LEGS (FORK END DOWN) USING ½” X 4” BOLTS,
THEN BOLT THE LEG TO THE TOP OF THE BACK SIDE OF THE FRAME USING THE ½" X 6 ½" BOLTS.
BOLT THE MIDDLE LEG SUPPORT TO THE UPPER & LOWER LEGS USING ½” X 4” BOLTS.
LEG ADAPTERS (IF APPLICABLE) - ATTACH THE LEG ADAPTERS USING 3/8” X 3 ½" BOLTS
TIGHTEN ALL BOLTS – USE THE LEG LEVELERS TO ADJUST PITCH. (SAME ON BOTH SIDES)
PUT WHEELS ONTO THE ARMS AND INSTALL THE ARMS INTO THE FRAME (20 ARMS TOTAL) -
INSERT THE ARMS INTO THE FRAME ARM HOLES BY SLIDING UP THEN DROP DOWN INTO THE BOTTOM HOLE
​
*** PROVIDED HARDWARE – SIZE 9X6 / 11X8 / 12X9 - FRAME/LEG BOLTS - (4) 1/2" X 6 ½” - (6) 1/2" x 4” BOLTS - (10) 1/2" NUTS & WASHERS – LEG ADAPTER BOLTS (8) 3/8” X 3 ½" BOLTS - (8) 3/8” NUTS AND WASHERS - 20 BLACK WHEELS – RUG CLIPS ***
​
NOTE – THE ZUES 20 ARM UNIT PICTURED BELOW IS SHOWN WITHOUT LEG ADAPTERS